Rear extensions are common on Pontypridd's terraced and semi-detached streets, and most have a flat roof meeting the original back wall. That junction takes the worst of the weather. If it is poorly formed, water gets behind the covering and into the house. Here is how we form it, and why each part of the detail matters.
Why the wall junction matters
The covering has to run up the house wall and be sealed there, forming an upstand. Water runs down the wall in heavy rain, straight onto this line. A shallow or loosely fixed upstand is one of the commonest causes of a ceiling stain along the back of an extension. Rear walls on hillside houses can also be wet for long periods after rain, which keeps the junction under pressure and shows up weaknesses sooner.
Forming the upstand
We bring the roof covering up the wall to a sensible height above the surface, using one continuous piece where we can. In rubber or fibreglass roofs this means a properly bonded or laid-in detail. In felt it means correctly lapped layers, with corners shaped and not simply folded. We also finish the corners carefully, because folded corners are where water most often finds a way in.
Flashing over the top
The top edge of the upstand must be protected. Where the wall is brick or stone, a metal flashing is usually let into a mortar joint and sealed, and where the render or cladding is in the way, we adapt the method. The aim is that rain falling down the wall cannot get behind the upstand.
- Flashing tucked into a cut joint, not just stuck on the face.
- Overlaps arranged so water runs outwards.
- Sealant used as a final touch, not as the main defence.
- Stepped flashing where the wall line changes.
Older walls and uneven surfaces
Many older houses here have walls with soft mortar, painted brick or patchy render. Fixing a flashing to crumbling material fails quickly. We check the condition of the wall first and repoint or repair small areas where needed, so the new detail has something sound to hold onto. Where the old wall is damp or crumbling, no flashing will last, so the wall comes first.
Signs the junction is failing
You can often see trouble from the ground or from inside, without going anywhere near the roof, so there is no need to climb up. Tell us if you notice any of these, and add a photograph if you can. Small signs are worth reporting early. A thin damp line along the ceiling is much easier to put right than a saturated plaster edge, and catching it early often keeps the repair small.
- Damp or peeling paint along the ceiling edge next to the house wall.
- Staining on the wall above the extension roof.
- Sealant that looks cracked or pulling away from the brickwork.
- A flashing that is visibly lifting or hanging loose.
Get a Free Flat Roof Quote in Pontypridd
Flat Roofing South Wales provides free, no-obligation quotations in Pontypridd and the surrounding area.
Call 07766 547309More Flat Roof Guides for Pontypridd
Flat Roof Questions Answered
Is the join with the house wall the first place to leak on an extension?
Very often, yes. It is where two different structures meet and move at different rates. On Pontypridd extensions we check the upstand, the flashing and the wall surface together, since a fault in any of them lets water behind the roof covering.
Can a flat roof be flashed without cutting into the house wall?
Sometimes, using a surface-fixed system, but a cut-in flashing is usually more reliable on brick or stone. We look at the wall on site and explain which approach suits it, and whether any wall repair is needed first.
Will a new flat roof covering mean new flashings too?
Normally yes, because the flashing and the upstand are part of one weatherproof system. Reusing old flashing risks leaving a weak point under a new covering. We assess what is sound on site and tell you plainly what we would replace.