A flat roof replacement is less disruptive than most people expect, but it helps to know what will happen. This is the order we usually work in on homes across Port Talbot, from terraces in Taibach to extensions in Baglan. How long it takes depends on the size of the roof and the weather, so we agree the plan with you beforehand.
Before we start
We arrive, check access and agree where materials can be kept. If we need to cross a driveway or a neighbour's boundary, we talk it through first. Furniture, plants and anything fragile near the roof or under it are best moved beforehand. We also check the forecast, since a flat roof should not be left open in rain or strong wind.
Stripping back to the deck
The old covering and any failed layers come off, and we clear the debris as we go. Once the boards are bare we see their true condition for the first time, which is why a quote can only be firm about what we could see at the survey. Rotten or soft boards are cut out and replaced, and the deck is made sound and dry.
Preparing falls and edges
Water must be able to leave the roof, so this stage decides how well the finished job performs. Any rooflights, vents or pipes are prepared at the same time. Insulation, where specified, is laid over the vapour layer and fixed so it cannot lift. We check every fall with a level before any covering goes down, because correcting a puddle afterwards means taking the roof apart again, and a roof that drains badly will always find its weak point.
- Insulation or boards go down if the specification includes them.
- Falls are set so water runs to the outlet, not to a puddle.
- New edge trims and flashings are fitted ready for the covering.
Laying the new covering
EPDM is bonded in one sheet where possible and trimmed neatly at the edges. GRP is laid in layers and left to cure, which needs dry conditions. Felt is fixed in lapped layers with carefully finished joins. Each system has its own method, and we do not rush the curing or bonding that the material needs. We do not hurry that stage, however tempting it is to get the roof closed in before the light goes.
Finishing and leaving the site
We check the outlets, clear the gutters, inspect every edge and junction, and then sweep up and take the waste away. We walk you through the roof from the ground and answer questions. If weather stops work part way, we make the roof watertight before leaving and return when conditions allow. Planning or Building Regulations checks may be needed, and we advise before work starts.
Get a Free Flat Roof Quote in Port Talbot
Flat Roofing South Wales provides free, no-obligation quotations in Port Talbot and the surrounding area.
Call 07766 547309More Flat Roof Guides for Port Talbot
Flat Roof Questions Answered
Do I need to be at home while my flat roof is replaced in Port Talbot?
Not all the time, but someone should be available at the start for access and at the end for a walk-round. We agree arrangements beforehand, and you can contact us at any point if something changes. We tell you in advance.
What if it rains while you are replacing my flat roof?
We do not lay a covering in rain or strong wind. If the weather turns, we secure the work already done so the roof stays watertight, and we return to finish when conditions are suitable. Safety comes first.
Will you find extra work once the old roof is off?
Occasionally, yes. Soft boards or rot beneath the covering only show once it is stripped. We stop, show you what we have found, explain the repair and agree it with you before carrying on.