Rows of Victorian and Edwardian terraces in Roath, Cathays, Canton and Splott often have a kitchen or bathroom extension off the back, and most are topped with a flat roof. A good roof is a stack of layers, each doing one job. This guide walks through that stack from the timbers up, so you know what a proper build involves.

Starting with the structure underneath

Everything depends on the timbers. On a terrace extension the joists span from the old rear wall of the house to the new outer wall, and they must be sized for that span and the weight above. We check the old wall where the joists bear, because Victorian brickwork and lime mortar can be uneven or tired.

The deck goes over the joists, usually exterior plywood boards laid with staggered joints. Any sagging, rot or softness in the existing structure is dealt with before anything new is laid, because a new membrane over a weak deck only hides the problem for a while.

Creating the fall so water leaves

A flat roof is never truly flat. It needs a gentle slope towards the gutter or outlet, and in older terraces that often means tapered boards or firring strips over the joists. Cardiff gets plenty of rain blowing in from the Bristol Channel, so standing water is the enemy and the fall is set out carefully before any layer goes down.

Insulation, warm roof or cold roof

Insulation can sit above the deck, which is called a warm roof, or between the joists, called a cold roof. Warm roofs keep the timbers inside the heated space and cut condensation risk. Cold roofs need ventilation gaps that terrace extensions do not always allow, so we look at the room below, the existing ceiling and the available height before recommending one.

Whichever route is chosen, a vapour layer sits on the warm side and the insulation boards are fixed tightly with no gaps, because cold bridges show up later as damp patches on the ceiling. We also check that the ceiling below is sealed, since warm moist air from a kitchen or bathroom will find any gap and condense on cold surfaces above.

The waterproof covering

The covering is then laid over the insulation. EPDM rubber arrives as a single sheet that is bonded down, which suits simple shapes with few joints. GRP fibreglass is laid in liquid form and cures to a hard seamless shell, which suits awkward outlines. Felt is built up in layers and suits some existing details. We explain which fits your extension and why, rather than pushing one product.

Edges, walls and the finishing details

Most leaks start at the details, not the middle of the roof. Where the extension meets the main house wall, a flashing or upstand must be tucked in properly, and the edge trim must throw water into the gutter rather than behind it. Before we start, we agree each of these points with you, and they are listed below.

Get a Free Flat Roof Quote in Cardiff

Flat Roofing South Wales provides free, no-obligation quotations in Cardiff and the surrounding area.

Call 07766 547309
Flat roofing in Cardiff · Flat roof repairs · Flat roof replacement

More Flat Roof Guides for Cardiff

Flat Roof Questions Answered

Can a flat roof be fitted on a terrace without disturbing the neighbours?

Often yes, though a terrace brings shared walls and close boundaries. We look at how the roof meets the party wall, protect the neighbouring side during the work, and keep you informed of access needs. It may need planning or Building Regulations checks, and we advise before work starts.

Should the old Victorian rear wall be checked before a new roof goes on?

Yes. The roof edge relies on that wall to take the flashing and support the joists. We look at the brickwork, pointing and any damp staining before fixing anything, because a new roof on a poor wall will leak at the junction however well it is laid.

How long will a new flat roof take on my Cardiff extension?

That depends on the size, the shape, the condition of the deck underneath and the weather. A small extension is quicker than a long one with several upstands and a roof light. We give you a sensible expectation after seeing the roof in person and surveying it properly.